Is your home heating ready? ——Wall-hung boiler

Winter is coming, is your fireplace ready to turn on?
Have you done a few tasks before starting up?

Step1 Water, electricity, gas and pipeline inspection

1. Confirm that the pipeline valve is open, and pay attention to whether the pipeline system is dripping or leaking;


※When installing a heating system with a radiator, pay attention to the temperature control valve on the radiator.


※When installing a floor heating system, you need to pay attention to the collector and distributor. First, open the valve of the main water supply pipeline of the water divider. When the temperature of the hot water gradually rises and is injected into the pipeline to circulate, check whether the connection of the water divider is abnormal, and then gradually open the branch valves of the water divider to check the operation status.







2. Confirm that the power is on;

3. Confirm that the gas valve is open, and check the sealing performance of the natural gas pipeline and all joints at the same time, whether there is any natural gas leakage in the home
Happening.


Step2 Water pressure control check

The water pressure of the wall-hung boiler should be controlled between 1.0-2.0bar. If the water pressure is lower than 1.0bar, the water supply valve should be opened to make up water, and the pressure should be adjusted to the normal range before starting.

1. First check whether there is a leak in the heating system and confirm that the system is completely airtight;

2. Find the water make-up valve at the bottom of the boiler and open the make-up valve to make up water;

3. Observe the water pressure gauge on the operation panel. When the pointer of the water pressure gauge is between 1.0-2.0bar, you can turn the water supply valve in the reverse direction and turn on the boiler.

※If the water supply valve is not closed in time, it will cause a flooding accident


Step3 Unblock the "gas block" of the pipeline

After turning on the heating mode, pay attention to whether the heating system is heating normally. If you find that the heating is not hot, don't worry, it may be "air block". After a heating season, the air precipitated by the hot water in the heating pipes gathers in the pipes, which will hinder the normal flow of hot water in the system pipes, causing the heat transfer radiator to fail to work normally.

'※If the floor heating is installed, it must be exhausted on the manifold
※If you install a radiator, you need to vent on the vent valve

Heatcold is a global professional indoor temperature and air solution application expert, always focusing on intelligent control solutions in the field of comfortable home furnishings, and is committed to creating products and services that can bring people joy.

评论

此博客中的热门博文

Chiller installation technology

1. When selecting the position of the lifting point, first consider the best position of the air circulation, and secondly consider the direction of the structure of the storage body. 2. The gap between the chiller and the slab should be greater than the thickness of the chiller . 3. All the slings of the chiller should be tightened, and the bolts and slings should be perforated with sealant to prevent cold bridge and air leakage. 4. When the ceiling fan is too heavy, use the No. 4 or No. 5 angle iron as the lintel. The lintel should span across the other roof and wall panels to reduce the load. Small Water Chiller Units   Laser Chiller Systems   Industrial Air Chiller

Full-servo pull up diaper production line

With the development of  technology, the diaper machinery industry is also progressing with it. This time, XINGYUAN DNW machinery launched full servo Pants production line. This production line can be compatible with two or three pieces, and can be designed into two or three pieces and other configurations according to customers' requirements. In order to meet the needs of customers, there are many optional configuration, O cutting unit, we used is the industry's top brands, PNO, HCH also used this brand. Basic configuration is controlled by servo motor, the brand is mitsubishi. Reasonable and solid square steel frame, painted with baking paint, with second working platforms. A customer asked how to make a diaper , and we showed him the whole production process. He was very pleased to say that your process for making diapers is the same as that of HCH and Xing Shi. The workshop is very clean, good quality, low price, very cost-effective. Now let's take a look ...

Copper rod machine melting,Copper rod upcasting machine,Copper plating line

China is short of copper, and China is also a big copper user. At present, the copper consumption of China's cable industry is about 7.5 million tons, accounting for more than 60% of China's total copper consumption, accounting for about 1 percent of the world's total copper conductor consumption, making it the largest copper user in the world. In order to solve the serious situation, the smart Chinese people try to use the machine which could meet the energy-saving requirement to produce the cooper rod. D&S copper rod making machine adopts the advanced fire refining technology to produce the¢8MM bright low-oxygen copper rod which is meet the international standards in the continuous casting line. The features of the production line are continuous casting and rolling process. There is no interruption from melting of raw material, casting process, rolling process and delivery of product, and it has high efficiency due to automatic control throughout the entire process. ...